Kvasir Group Supervisors travelled to UAE to advise and oversee local engineers carry out cable cut then joint for power and control cables in way of a new Moon Pool Installation. Kvasir Group Engineers carried out jointing of thruster propulsion cables, testing of all cables then commissioning of systems carried out.