FD Indomitable, FD Incomparable & FD Honorable, were sold and sent to Baku for duty there.

This required the removal of each vessel Bridge to allow passage under Bridges en route.

The releasing of all cabling travelling between the Mainmast, Bridge and Lower Deck, had to be identified and logged for re-connection.

This amounted between 1200 to 1600 cables per vessel.

The three vessels were towed to Baku where they had their wheelhouse tops re-established.

Kvasir supervised the local shipyard electricians in re-connection of all cabling and services, additionally conducting power-up of all systems.